GAS CONCRETE PLANT

Client
Location
Aşkabat/Türkmenistan
Type
Industrial Facility Projects
Area
9.500 m²
Scope of Service
Design
Year
2010
Description

Cellular Concrete Factory has 9.500m² covered area. It consists of 12 different buildings. In the building, medium voltage switchgear installations 2x1.600kVA transformer center and 2x1.000kVA diesel-generator group, 60kVA uninterruptable power supply distribution system, low voltage and weak current systems have been designed by our company.